Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
Retaining Walls · Poured
Slope Retention in Boston Starts with Poured Concrete Retaining Walls
When a Boston lot slopes steeply or a driveway cut needs structural support, a poured concrete retaining wall is the permanent answer. We size the slab footing below the frost line, reinforce the wall to the load, and install drainage behind it so water pressure never builds. The result is a wall that stays plumb through decades of freeze-thaw cycles.
- Engineered for the slope and height
- Drainage behind every wall
- Free written estimate, firm schedule
Why poured concrete wins
Poured Walls Outperform Block for Tall, Loaded Slopes
Three failure modes plague residential retaining walls: undersized design that can't handle the soil load, missing or failed drainage that lets water pressure build behind the wall, and shallow footings that heave in winter. A properly engineered poured concrete wall eliminates all three by design.
Poured concrete is the right choice when the wall runs tall, spans a long distance, carries a driveway or structure above it, or when you want a single monolithic face without block coursing. For modest grade changes on shorter runs, a block retaining wall can deliver better value. We assess your site and recommend the right approach.
Poured walls often tie into basement waterproofing or foundation installation work, especially when the wall retains a cut for a walkout or new basement level.
The build sequence
How a Poured Concrete Wall Gets Built in Boston
-
Site assessment and engineering
We measure the slope height, identify the soil type, note any loads above the wall (driveway, structure), and send the details to an engineer who sizes the footing depth, wall thickness, and rebar schedule for the specific conditions.
-
Excavate and form the footing
The footing trench is dug below the frost line (typically 3–4 feet in Boston), formed to the engineered dimensions, reinforced with rebar, and poured in one continuous lift so it cures as a single monolithic base.
-
Form and pour the wall
Once the footing cures, the wall forms are set plumb and braced, rebar is tied through the full height with proper lap splices, and the wall concrete is poured and vibrated to eliminate voids and ensure full consolidation.
-
Install drainage and backfill
Drainage stone is placed against the back face of the wall, a perforated drain pipe at the footing level is routed to daylight or the property storm system, and the cut is backfilled with the drainage path confirmed open and clear.
The drainage conversation
Water Pressure Behind the Wall Is the Real Enemy
Retaining walls don't fail from weak concrete. They fail from water trapped behind them. Hydrostatic pressure multiplies the effective soil load by a factor of 2 or 3, and over time even a heavily reinforced wall can be pushed past its design limit. That's why drainage is the first thing we discuss on every project.
Every poured wall we build includes drainage stone against the back face and a perforated drain pipe at the footing that routes water to daylight or the property storm system. This small addition to the cost is the difference between a wall that stays dry and stable for 50 years and one that leans, cracks, or fails. We apply the same drainage standard across all residential concrete work, from foundation waterproofing to basement floors.
Related retaining wall options
See Our Other Retaining Wall Services
Poured concrete is one of three retaining wall approaches we offer. Compare the alternatives.
Common questions
Poured Retaining Wall Questions, Answered
Engineering, drainage, footings below frost and when poured beats block for residential walls.
Engineered, drained, footing below frost. Wall is plumb to within a fraction, drainage is dry behind it. Worth doing once and properly; the yard finally makes sense.
Holding back the cut for our walkout basement and the driveway above it. Single continuous face, no joint pattern to weather. Looks like part of the architecture.
Drainage was their first conversation, not the concrete. Got the why right; the wall is dry behind, stable in front, and stayed that way through spring melt.
Engineer worked directly with the crew. Calcs to drawings to pour, nothing got fudged. The wall is bombproof and the budget held to the dollar.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Boston.
Ready to start
Get Your Free Poured Wall Estimate
Share the slope height, wall length, and what sits above or below the wall, and we'll provide a written quote with schedule and pricing.
We'll assess the wall site and send a written quote within one business day.